Herman Mashaba puts brakes on bicycle lanes project in JHB

The Johannesburg mayor says he was shocked to hear that R70m had been allocated to finish the project.
Source: Local News

© 2022 Lenasia South Muslim Association. All Rights Reserved. Website By: ICON DESIGNS

×